Inbetriebnahme
Inbetriebnahme laut Global Iron and Steel Tracker, March 2026 (V1); Datumsgenauigkeit entspricht dem Trackerwert.
Lieferant/Partner: (For the original furnace in 1986) About 40 design institutes, including the general designer, Lengipromez, took part in the design of almost 250 objects of the blast furnace complex